Soil too close to siding. The soil should be dug down at least six inches (6″) from the wood of the siding. The soil should then slope away from there to drain water away from the structure. Gravel should then cover the soil to prevent soil from being splashed up onto the siding. Read the rest of this entry »
Republished by Blog Post Promoter
